View Single Post
Old 01-09-2016, 01:24 AM   #24
andakn
Member
 
Join Date: Nov 2015
Location: missouri
Posts: 99
iTrader: (0)
Default

Only good way I've seen a top mount work on ti is to remove a/c for header clearance and relocate battery so down pipe can go down there. I think they had cut down through just sheet metal no frame cut but i would still brace it myself. The one i saw had a 4in down pipe and it looked like they bored down with a 5in hole saw and put a 5in pipe down through and welded in place. The down pipe went through it. I don't know if it was for heat shielding or re structure but I'd do it with both in mind.
andakn is offline   Reply With Quote